Mission One
Allgemeine Merkmale
The Mission One represents a revolution in motorcycle and electric vehicle performance. Mission Motors’ advanced electric powertrain makes the Mission One the first electric sportbike to power wheelie at 70 mph. It powers the Mission One a top speed of 150 mph.
Mission One Verlauf
Mission One Historie & Generationen Quelle: Wikipedia
During the pre-production in late 2019, the Swiss government refused to authorize any explosions for the train sequence in the Alps; as a result, the production team embarked on location scoutings in different countries to find an unwanted railway bridge. Among those asked to help with staging a "full-scale train crash" was Polish-American film producer Andrew Eksner. In November 2019, the Polish State Railways proposed Eksner use a 151-meter-long (495 ft), 1908 German-era riveted truss bridge on Lake Pilchowickie, in the Jelenia Góra Valley, in Lower Silesia. In December 2019, Paramount Pictures producers including McQuarrie landed in southern Poland, accompanied in deep secrecy by officers of the Polish engineering troops. McQuarrie documented the visit on Instagram. Officially opened in 1912 by Wilhelm II, the proposed bridge survived World War II mostly intact, and was used by trains until 2016. Despite publicly praising the bridge as "extremely valuable," an expert misrepresented conclusions of a commissioned report, that instead of renovating, it would be best to demolish the bridge and build a new one. In March 2020, after the rejected Eksner spread the information, local authorities and museum officials were appalled by the producers' intention to physically destroy the bridge, instead of using CGI effects. The filmmakers and government officials said the bridge was intended for demolition. By July 2020, history and railway enthusiasts, scientists and filmmakers protested, along with the regional Monuments Heritage Office, members of Polish parliament, and the International Committee for the Conservation of the Industrial Heritage. Activists and NGOs launched a petition against the destruction. As it was long registered provincially, and being added into Poland's national Registry of Cultural Property, the Ministry of Culture and National Heritage confirmed it was pushing the bridge to play in the film, with a "small section" to be demolished onset, before revitalizing the related local heritage railway line altogether. Following the backlash, the General Conservator of Monuments assured "there was no question" of destroying the bridge. In August 2020, as the story turned international, McQuarrie said there was never a plan to blow up the bridge, and that only unsafe and partially damaged portions could have been destroyed, which allegedly needed to be rebuilt, concluding: "To open up the area to tourism, the bridge needed to go." He later added that "there was no disrespect intended". The production company did not pledge to cover construction costs of a potential new bridge, nor the renovation of the historic one. Eventually, cultural property registration procedures for the Lake Pilchowickie bridge were finalized, effectively preventing it from any damage. In May 2021, Eksner sued the Paramount production crew including McQuarrie and Cruise for breach of contract. Filming of the train wreck scene was expected to take place between April and June 2021 on a constructed set in a disused quarry in the Peak District National Park in Stoney Middleton, England, with a railway line and part of a bridge over the cliff edge. After two weeks of suspended filming, the scene was filmed on August 20, when a mockup Britannia Class locomotive was propelled off the cliff into the quarry.
History text adapted from Wikipedia under CC BY-SA.
Mission One Technische Daten
Q&A
Nutzer-Fragen & Antworten (Forum) demnächst verfügbar.
Kommentare
Noch keine Kommentare. Sei der Erste!
Galerie
Wallpaper-Downloads (Desktop & Smartphone) demnächst verfügbar.